Applied Engineering wing opens for the 2026–27 school year
After two years of construction, the 22,000-square-foot addition brings four dedicated labs, a robotics bay, and a fabrication shop to the north campus. Ribbon cutting is set for September 24 at 4:30 p.m., followed by student-led tours.